Subject: 14.15 (Item #18) Final Change Order 1661-001 (DEDUCTIVE) for Lease/Leaseback #1664 – Taber Construction Inc. for Middle School General Science Buildings 2014, at Diablo View, Pine Hollow, Pleasant Hill and Sequoia Middle Schools
LCAP (Local Control Accountability Plan) Goal:
Strategic Initiative 5.3 Optimal Operations and Infrastructure
Ensure that our facilities and infrastructure support and enhance student learning and safety.
Policy:
Enclosure
File Attachment:
01-FCO 1664-001 General Science Project.pdf
Summary: On December 11, 2013 the Board of Education awarded Lease / Leaseback Agreement #1664 to Taber Construction, Inc. for a Guaranteed Maximum Project Cost of $6,826,871.95. Lease was for provision of all tools, materials, labor and equipment necessary to complete Middle School General Science buildings 2014 Project at Diablo View, Pine Hollow, Pleasant Hill and Sequoia Middle Schools.

As a result of unused contract contingency, a single, final deductive change order in the amount of <$62,914.93> is necessary. This single, final change order will result in a final revised contract value of $6,763,957.02 and represents a decrease of 0.92% to original contract value.
Funding: 2010 Measure C
Fiscal Impact <$62,914.93> DEDUCTIVE
Recommendation: Approve the Final Change Order 1661-001 (DEDUCTIVE) for Lease/Leaseback #1664 – Taber Construction Inc. for Middle School General Science buildings 2014, at Diablo View, Pine Hollow, Pleasant Hill and Sequoia Middle Schools.
Approvals:
Recommended By:
Signed By:
Tim Cody - Program Manager
Signed By:
Dr. Nellie Meyer - Superintendent
Vote Results:

Original Motion
Member Moved, Member seconded to approve the Original motion 'Approve all Consent Agenda items.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Linda Mayo     Yes
Barbara Oaks     Yes
Brian Lawrence     Yes
Cheryl Hansen     Yes
Lynne Dennler     Yes